- Under the final rule — FAR 1.108(d), UC, along with other institutions of higher education, is required to enroll in E-Verify once awarded a federal contract or subcontract that requires participation in E-Verify as the term of the contract.
- When UC is awarded a federal contract that contains the FAR E-Verify clause, UC, as the contractor — and any covered subcontractors on the project — must enroll within 30 calendar days of the contract/subcontract award date.
- UC must also post the Right to Work poster and the E-Verify Notice.